Clinton Pilot Program


Clinton Pilot Housing Rehabilitation Program

Extent of Rehabilitation Work

  • Complete “Gut” of the interior down to bare studs, ceiling joists and floor joists and replacement of any damaged wall, ceiling, and flooring.

  • Includes complete removal and replacement of HVAC, Electrical, and Plumbing infrastructure.

  • Includes complete investigation of additional potential underlying problems.

  • Includes complete elimination of hazardous materials such as mold, lead based paint, and asbestos.

  • Complete removal and replacement of interior doors and trims.

  • Complete “Strip” of the exterior wall and roof coverings down to the sheathing and replacement of siding and roofing materials.

  • Removal and replacement of all exterior doors and windows.

Current Houses For Sale:

Contact

Craig Elskamp

Building Inspector / Building Rehab Specialist.

563-690-5760

celskamp@ecia.org

Sign up for enotification